Project

Lithium-ion materials. A focused Phase 1 platform.

A Turkey-based lithium-ion battery pre-treatment project designed to produce recoverable black mass and separated copper-rich, aluminium-rich and plastic fractions.

Conceptual material study showing black mass, copper-rich, aluminium-rich and plastic fractions
Conceptual Phase 1 material study Black mass · copper-rich · aluminium-rich · plastic

Stage-gate roadmap

From investment readiness to commercial qualification.

Current position Investment & pre-commissioning

Each gate is intended to produce the evidence required for the next decision. Timing and sequence remain subject to funding, counterparties and technical validation.

  1. 01
    Current

    Investment readiness

    Project structuring, equipment pathway and pre-commissioning planning.

  2. 02
    Planned

    Equipment confirmation & FAT

    Confirm configuration and validate agreed performance criteria before dispatch.

  3. 03
    Planned

    Installation & integration

    Site preparation, equipment installation and system integration.

  4. 04
    Planned

    Commissioning validation

    Establish safe operating parameters, throughput and separation performance.

  5. 05
    Planned

    Product qualification

    Representative sampling, independent analysis and buyer specification review.

Future development · Phase 2

A future pathway, clearly separated from Phase 1.

Future development, subject to feasibility, technical validation and funding.

Phase 2 may evaluate downstream refining pathways at a later stage and would require a separate feasibility, technical-validation and funding decision.